Metro readies for Cyclone Nora
PERTH (miningweekly.com) – The start of mining operations at the Bauxite Hills mine, in Queensland, could be delayed by a week, Metro Mining has warned, as the company prepared the site for Tropical Cyclone Nora.
Metro on Friday reported that all non-essential staff and contractors had been flown out from the Bauxite Hills mine as a precautionary measure, after Tropical Cyclone Nora developed in the Gulf of Carpentaria.
While the mine site was not in the predicted cyclone path, it was within range of a possible cyclone path.
Mining operations were due to start during the week of April 2, but Metro has warned shareholders that this could be delayed by up to one week, depending on the extent of the rainfall, speed of staff mobilization back to site, and the extent of any storm related damage.
Despite the possible delay in the start of mining, Metro has maintained the 2018 production target for the project.
The project is expected to produce at an initial rate of two-million tonnes a year ramping up to six-million tonnes a year in the fourth year of operation.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation