https://www.miningweekly.com

Lower grades impact Panoramic production

31st January 2020

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Nickel miner Panoramic Resources has reported a 22% decline in nickel production and a 19% decline in copper production for the December quarter, compared with the previous three months.

Nickel-in-concentrate production at the Savannah operation, in Western Australia, declined from 1 342 t to 1 042 t during the December quarter, while contained copper declined from 855 t to 695 t.

Despite higher mined tonnage from the Savannah operation, both nickel and copper grades declined during the quarter, resulting in the lower production.

Unit cash costs for the quarter were also negatively impacted by the declining grades, with operating cash costs increasing from A$9.74/lb to A$12.76/lb.

Panoramic earlier this week downgraded its full year production expectations to between 5 200 t and 5 600 t of contained nickel, between 3 400 t and 3 700 t of contained copper, and between 280 t and 320 t of contained cobalt.

This compared with the previous guidance of between 7 000 t and 7 500 t of contained nickel, between 4 500 t and 5 000 t of contained copper, and between 400 t and 450 t of contained cobalt.

The decrease in production expectation was driven by lower production volumes in the second half of the financial year, driven by revised mining contract equipment mobilization timing and forecast personnel ramp-up, as well as further revised scheduling for mining activities at the Savannah remnant ores.

The ASX-listed miner is currently working to bring the Savannah North project on line, with first stoped ore planned for the March quarter of this year.

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION