https://www.miningweekly.com

Lower chrome price, higher costs drag down Tharisa’s interim earnings

10th May 2019

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

JSE- and LSE-listed platinum-group metals (PGMs) and chrome producer Tharisa expects to report basic earnings per share (EPS) and headline earnings per share (HEPS) of $0.04 apiece for the six months ended March 31.

This is a decrease of 60% compared with the EPS and HEPS of $0.10 apiece reported for the six months ended March 31, 2018.

The company has attributed the lower earnings to a material weakening of the metallurgical grade chrome concentrate price by 15.5% from $193/t in the first half of the 2018 financial year, compared with $163/t in the first half of the current financial year; a 14.8% year-on-year reduction in the volumes of chrome concentrates sold to 618 000 t; and an 11.9% year-on-year reduction in PGM volumes sold to 67 000 oz.

Additionally, the company’s EPS and HEPS were impacted on by an increase in cash costs per tonne mined, as a result of lower mining volumes, which reduced economies of scale. Costs were further impacted on by above inflation increases in costs, such as diesel of 18.1% per litre (in rand terms), which typically comprises about 14% of on-mine cash costs.

Meanwhile, production volumes and recoveries of both chrome concentrates and PGMs had trended upwards in the second quarter, compared with the first quarter ended December 31, 2018, and management expects this positive trend to continue into the second half of the financial year.

Tharisa remains on track to meet its production guidance for the full-year of 150 000 oz of contained PGMs and 1.4-million tonnes of chrome concentrates.

Tharisa’s interim results will be published on May 15.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION