https://www.miningweekly.com

Lithium grades at Uis surpassing AfriTin's expectations

8th June 2022

By: Creamer Media Reporter

     

Font size: - +

Initial assay results from a lithium and tantalum drilling programme at Aim-listed AfriTin Mining's Uis mine, in Namibia, have produced lithium grades surpassing the company's expectations, says CEO Anthony Viljoen.

He adds that the drilling results reinforce the company's belief that the Uis mine is host to one of the largest lithium resources globally.

The infill drilling programme is being conducted at the main V1/V2 pegmatite at Uis, which is currently being mined to extract tin, with a view to increasing the confidence of the existing lithium and tantalum estimates of the deposit.

The programme comprises about 50 holes, with drilling for 27 holes having been completed thus far.

The initial assay results are for the first four holes drilled, with pegmatite intersected in all holes at depths and apparent widths as predicted by the geological model.

Significant V1/V2 pegmatite intersections include 132 m at 0.168% tin, 75 ppm tantalum and 0.74% lithium oxide (Li2O) for drill hole V1V2049, from 124 m to 256 m; and 110 m at 0.171% tin, 92 ppm tantalum and 0.75% Li2O for drill hole V1V2057, from 92 m to 202 m.

Notable intersections of lithium mineralisation within the pegmatite include 8 m at 1.08% Li2O for drill hole V1V2036, from 140 m to 148 m; 10 m at 1.05% Li2O for drill hole V1V2045, from 136 m to 146 m; 12 m at 0.99% Li2O for drill hole V1V2049, from 231 m to 243 m; and 45 m at 1.04% Li2O for drill hole V1V2057, from 136 m to 181 m.

"While the V1/V2 pegmatite displays impressive dimensions and is open-ended at depth, a multitude of surrounding pegmatites present significant upside potential.

"As a former mining operation, Uis has been extensively drilled but historic assaying has focused solely on the tin with no regard for the lithium or tantalum in the deposit. This programme will increase the confidence of the current lithium and tantalum estimates and is part of our strategy to bring these two commodities into production alongside our tin operation.

"Our recently released preliminary economic assessment for the Phase 2 project, in April, highlighted the economic potential of these by-product elements which are game changing. The construction of a new lithium pilot plant will allow us to progress to commercial production phases much faster than a new greenfield lithium resource elsewhere,” comments Viljoen.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION