https://www.miningweekly.com

Largo Resources achieves 71% of Maracas Menchen mine’s first phase capacity

27th October 2014

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – Vanadium producer Largo Resources' flagship Maracas Menchen mine, in Bahia state, Brazil, last week achieved a production record, representing about 71% of the plant’s designed Phase 1 capacity.

The company reported a 40% production rate early this month.

Largo said on Monday that over a 24-hour period late last week, output was 19 t of vanadium pentoxide, billing the achievement as setting a significant new benchmark in the ongoing ramp-up process.

The company had been battling with production issues after starting the plant ramp-up in June this year.

In a mid-October conference call, CEO Mark Brennan, in response to analyst questions, stated that Largo expected to catch up to its previously published ramp-up schedule by November. The operation was scheduled to reach full production by the first half of next year.

Largo expected output to reach a rate of 9 600 t/y of vanadium pentoxide, at cash costs of between $5.50/kg and $6/kg. The second phase of the project would see output rise to 14 400 t/y within the next three years, potentially giving the company the ability to supply up to 10% of global demand.

The Maracas Menchen deposit was regarded as the richest, highest-grade vanadium deposit in the world.

Despite reduced current demand growth from Chinese smelters producing higher-quality steel, similar to European or US standards, and materials advances in the aerospace industry, the global market is expected to grow at about 5% a year.

Vanadium is added to steel in small quantities to make it significantly stronger and more resistant to rust.

Largo has a six-year, take-or-pay contract to sell all Maracas’ output to global trading firm Glencore.

Edited by Tracy Hancock
Creamer Media Contributing Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION