https://www.miningweekly.com

Lake Resources shares hit by short seller's lithium tech allegations

12th July 2022

By: Reuters

  

Font size: - +

Short seller J Capital Research on Monday alleged that Lake Resources plan to produce lithium in Argentina is based on a process from Lilac Solutions that likely does not work, the latest attack against a wave of new technologies aiming to produce the electric vehicle battery metal.

Shares of Lake, which are traded in Australia, fell 6.3% on Monday after J Capital's report outlined several alleged missteps by Lake's management and claimed that technology developed by Lilac is too costly to run and uses too much freshwater.

Privately-held Lilac is among the most-prominent developers of so-called direct lithium extraction (DLE) technologies aiming to extract the battery metal from brine using a range of equipment, though none have worked at commercial scale. Read full story(Full story)(Full story)

"Lake has hitched its cart to Lilac's yet-to-be-proven technology," J Capital Research said in the 17-page report. "Investors still have no evidence that the Lilac DLE technology works at scale, and if so, at what cost."

Lilac signed a deal with Lake last September to develop the Kachi lithium project in Argentina, part of a plan to evolve from a technology company to a lithium producer. 

In April, Ford Motor Co F.N signed a preliminary lithium supply deal with Lake. 

Representatives for Lake could not immediately be reached for comment. J Capital declined to disclose the size of its short position.

Lilac's technology uses ceramic beads to attract lithium in batch cycles, akin to a laundry machine, after which a water-and-acid mixture is used to wash off the metal.

J Capital alleges in the report that the beads only work for 150 cycles, making Lake's project uneconomical.

Lilac CEO Dave Snydacker said that figure is "factually inaccurate" and that his company has tested the beads at more than 1 000 cycles.

"I don't know where they got that number from. Maybe they're guessing," Snydacker told Reuters, adding his company expects to deliver a pilot plant to Lake's Kachi site by the end of the month.

"We have a high degree of confidence that our plant will be successful because we've supported the design with so much test work."

Edited by Reuters

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION