https://www.miningweekly.com

Kenmare expects better grades at Moma in the third quarter

11th July 2019

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

London-listed Kenmare Resources expects the heavy mineral concentrate (HMC) grades at its Moma mine, in Mozambique, to improve in the third quarter, following the planned mining of lower grades in the second quarter ended June 30.

The company on Thursday said that, despite an 18% increase in tonnes of ore mined, HMC production decreased by 27% year-on-year to 274 700 t in the second quarter, as a result of the lower grades.

“The second quarter this year was the weakest quarter forecasted for 2019 in terms of grade, which resulted in lower HMC production, but consequently higher grades are anticipated for the remainder of the year,” confirmed MD Michael Carvill.

Kenmare, nevertheless, remains on track to achieve its full-year production guidance.

Carvill expects demand for ilmenite to increase in the second half of this year, leading to higher prices.

The company produced 220 100 t of ilmenite in the second quarter, compared with 238 500 t in the second quarter of 2018, while its zircon output was 700 t lower year-on-year, at 11 000 t.

For the half-year ended June 30, Kenmare produced 633 400 t of HMC, 458 200 t of ilmenite and 23 100 t of primary zircon.  

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION