https://www.miningweekly.com

KBL receives environmental nod for WA project

22nd October 2013

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – The Western Australian Environmental Protection Authority (EPA) has approved ASX-listed KBL Mining’s development of the Sorby Hills silver/lead/zinc project.

KBL has completed a prefeasibility study for a Stage 1 development at Sorby Hills based on a conventional openpit mine and sulphide flotation concentrator operation, which will deliver 400 000 t/y of ore.

The mine will produce 20 000 t/y of lead and 800 000 t/y of silver over its ten-year life-of-mine, and will require a capital investment of A$70-million.

EPA chairperson Paul Vogel said on Tuesday that several environmental factors were examined during the assessment of the proposal, including potential impacts to vegetation and flora, marine environmental quality, human health and the ability to rehabilitate the area following the mine’s closure.

Vogel said while examining the proposal at the highest level of a Public Environmental Review, the EPA was concerned with the initial inclusion of an artificial wetland, in particular the capability of determining whether the water entering the wetland was of suitable quality.

“The EPA had a strong preference for the proponent to replace the artificial wetland with an evaporation basin and we are pleased the proponent took the EPA’s concerns on board and modified the proposal,” he said.

The EPA head added that the proposal footprint was also reduced from 767.25 ha to 573 ha during the assessment process.

KBL stated that it would progress the feasibility study, mining permits and operational licences for the Sorby Hills project, in preparation for project financing, construction and operations.

Current timing expectations would see KBL start construction by mid-2014, with operations expected to start 12 months later.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION