https://www.miningweekly.com

Kaz Minerals lowers 2020 capex as virus restrictions bite

30th April 2020

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Copper miner Kaz Minerals on Thursday announced that it would spend between $50-million and $100-million less this year on its Aktogay expansion project, as Covid-19 restrictions in Kazakhstan and elsewhere are negatively impacting on supply chains.

Restrictions are also reducing the availability of local contractors and preventing vendor representatives from entering the country to support equipment installations.

Capital expenditure for 2020 is now forecast to be $300-million to $350-million, rather than the previous guidance of $400-million. The balance of the unchanged $1.2-billion project budget will be incurred in 2021.

By December 2019, Kaz Minerals had already spent $663-million on the Aktogay expansion, which will double the mine’s sulphide ore processing capacity to 50-million tonnes from 2021.

The company stressed that the project remained on track for completion in 2021, as previously guided, but was now expected to start production in late 2021.

Meanwhile, Kaz reported copper production of 74 900 t in the first quarter, which is 7% above the prior-year comparative period and keeps the miner on track to achieve its guidance of 280 000 t to 300 000 t this year.

Its gold production came to 55 400 oz and was driven by high ore throughput at the Bozshakol mine.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION