https://www.miningweekly.com

Jubilee acquires additional PGMs tailings material in Eastern Limb orebody push

4th June 2021

By: Donna Slater

Features Deputy Editor and Chief Photographer

     

Font size: - +

Aim-listed metals processing company Jubilee Metals has acquired the rights to a further 944 000 t of platinum-group metals- (PGMs-) containing tailings on the Eastern Limb of the Bushveld Complex.

This follows a day after it announced that it had secured its first rights to tailings on the Eastern Limb in a separate transaction.

Until recently, Jubilee’s PGM operational footprint – which includes platinum, palladium, rhodium, ruthenium, osmium and gold – had been limited to the Western Limb, a single area of the two main PGM reefs in South Africa.

The latest agreement for the acquisition of surface tailings containing PGMs is linked to the prevailing PGMs basket price and is payable monthly in advance of uplifting the material and transporting it to Jubilee’s Inyoni PGMs plant.

Jubilee plans to start the upliftment of the PGMs material this month, targeting a minimum rate of 30 000 t a month, the equivalent of 1 600 oz of PGMs a month.

Jubilee CEO Leon Coetzer says the Eastern Limb has been a key focus of Jubilee to expand its PGMs reach and operational capacity and this material further solidifies the company’s presence there.

“Our reputation as the go-to partner in an ever-expanding operational footprint is just another example of our ability to outpace competitors and drive growth in the region and I am highly confident that we will secure further long-term feed supplies and operational presence driving our sustained earnings in South Africa,” he says.

The material will be initially processed at Jubilee’s expanded Inyoni PGMs facility.

The latest PGMs acquisition, together with those announced on June 3, ensures that the expanded Inyoni PGMs capacity is fully committed with current arising tailings alone, which excludes the existing historical tails already secured by Jubilee, thereby offering the opportunity to further expand the PGMs processing capacity.

In addition, Jubilee is considering implementing a dedicated processing facility on the Eastern Limb to further expand its processing footprint.

Nonetheless, the latest acquisition of material provides the option to Jubilee to secure additional processing capacity through acquisition, partnership or construction of a new facility to further expand its processing footprint.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION