https://www.miningweekly.com

Jameson optimises Crown Mountain output

13th August 2021

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – A yield optimisation study for the Crown Mountain coking coal project, in British Columbia, has increased anticipated production from the 1.7-million tonnes a year considered in the bankable feasibility study (BFS) to 1.96-million tonnes a year.

ASX-listed Jameson Resources on Friday said that the yield optimisation study, which was the first optimisation opportunity of the BFS, had confirmed increased product ash levels from 9.5% to 10.5% for North and East pit products, and from 9.5% to 11% for South pit product.

The increased yield and resultant increased exports has resulted in a 4% reduction in the operating costs, which is  now estimated at $89.41/t, while the net present value (NPV) has increased by 25%, to $469-million, compared with the BFS.

“The yield optimisation study further enhances the cost competitive position and positive economic returns for the project. Crown Mountain is a compelling value proposition with high quality hard coking coal and robust economic outcomes located in a well-recognised existing production area with close proximity to established infrastructure,” said Jameson chairperson Nicole Hollows.

MD Michael Gray said that the completion of the yield optimisation study improved the project’s attractive business case, adding that Jameson would continue to progress other opportunities to optimise the project in parallel with progressing approval of the environmental assessment.

“The project’s attractive economics and progress of the environmental assessment are confirmed by the International Energy Agency’s view that Crown Mountain is the most advanced steelmaking coal project in Canada,” he added.

The project is expected to have a mine life of 15 years, and would require a capital investment of $309-million, delivering 28.46-million tonnes of coal. In addition to the higher NPV, the project’s internal rate of return has also increased from the 36.4% considered in the BFS, to 40.2%.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION