https://www.miningweekly.com

IronRidge starts drilling at Côte d'Ivoire gold project

9th December 2019

By: Simone Liedtke

Creamer Media Social Media Editor & Senior Writer

     

Font size: - +

Aim-listed IronRidge Resources has started drilling at the Zaranou gold project, in Côte d'Ivoire.

Drilling at the licence, which borders with Ghana and is along strike from significant gold mines, is targeted to be completed early in the new year, with results expected during the first quarter of 2020.

While drilling is ongoing, the company says it will continue with regional soil sampling in the north-east and south-west portions of the licence, outside of areas of intensive artisanal and alluvial mining.

The drone survey, meanwhile, continues to generate high-resolution imagery and topographic control to assist in exploration drilling programmes and baseline studies.

IronRidge COO Len Kolff has commended the team on completing the drill planning, community consultation and drill access construction in time for the arrival of the Geodrill rigs, while continuing the mapping, soil sampling and drone survey activities.

"We are excited to get the drill programme under way to test below the extensive hard-rock artisanal mining zones with high-grade channel sampling results, as well as discrete magnetic anomalies spatially associated with the mineralised structures targeted by the artisanals,” Kolff comments, dubbing it “a challenging task”.

He explains that the area is vast, with over 40 km strike of alluvial workings within which the artisanals have discovered and defined 16 km strike of in-situ mineralised structures, of which IronRidge is testing about 8 km strike within the most intensively pitted zone.

"We believe the wide spaced [air-core] drill traverses across the width of the mineralised corridor, in conjunction with targeted deeper [reverse circulation] holes, will provide us with the best chance of testing the structures across strike and at depth at this early stage of exploration across a large area,” Kolff notes.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION