https://www.miningweekly.com

Intrepid shareholders approve sale of Zambia project to Weatherly

2nd February 2018

By: Simone Liedtke

Creamer Media Social Media Editor & Senior Writer

     

Font size: - +

JOHANNESBURG (miningweekly.com) - Shareholders of ASX-listed Intrepid Mines have voted in favour of Weatherly International's acquisition of the Kitumba copper project, in Zambia.

The proposed A$4.75-million deal was announced in December.

The transaction remains subject to regulatory approval by the Zambian Ministry of Mines and Minerals Development, as well as by the Zambian Competition and Consumer Protection Commission.

Weatherly on Friday also announced the outline of its project development plan for Kitumba, which focused initially on a high-grade and high-confidence Phase 1 development zone within the resource.

Previous development plans for Kitumba were based on a large-scale and high capital cost development of the entire resource from the outset, and also included a decision to follow a relatively complex processing route using pressure oxidation to oxidise the sulphide minerals.

Weatherly further stated that it intends to pursue a two-phase development approach focussed initially on a Phase 1 development zone of higher-confidence and higher-grade mineralisation within the overall resource at Kitumba.

The underground mine plan will be revised to focus on this Phase 1 development area, with capital expenditure reduced to suit a Phase 1 mining production rate of 750 000 t/y to one-million tons a year of ore.

Further, Weatherly intends to evaluate a lower-risk and lower-cost processing route using a combination of flotation and atmospheric leaching plus solvent-extraction and electrowinning to produce a concentrate containing the sulphide minerals for sale to local smelters, plus producing refined copper cathode from the oxide minerals within the resource. 

To assist with this work, Weatherly engaged mining consultancy MSA Group to provide an updated Joint Ore Reserves Committee-compliant mineral resource estimate using a 2% copper cutoff grade.

They have now completed that work and the measured and indicated mineral resource estimate at a 2% copper cutoff grade, comprising 9.5-million tons at 3.6% copper, contains 342 000 t of copper, with 5.3-million tons at 4.04% copper classified as measured, and 4.2-million tons at 3.05% copper classified as indicated.

Weatherly believes the change to a phased development approach focussed initially on high-confidence high-grade ore and the changed processing route will, together, significantly improve the financial metrics of Kitumba, and will allow the company to fast-track to financing and production.

Next steps involve re-logging of the substantial quantity of existing core and additional assaying to inform an improved geo-metallurgical model, followed by supplementary metallurgical testwork to form the basis of a new prefeasibility study (PFS) for a Phase 1 mine development.

Upon completion of a positive PFS this year, a bankable feasibility study will be undertaken and funding sought, with target completion by the end of 2019, for construction during 2020.

Once the Phase 1 development is financed and under construction, the company will examine a Phase 2 development, which will evaluate production or mine life extension options based on the overall resource.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION