https://www.miningweekly.com

Hochschild cleared to start mill construction at Peruvian project

20th September 2013

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – The Peru government has approved the mill construction permit for Hochschild Mining's 60%-owned Inmaculada advanced gold/silver project.

The company on Friday said this represented completion of the final stage of the project's construction permitting process with commissioning on track for the fourth quarter of 2014.

The processing plant is now set to start construction, with the project's total initial capital expenditure maintained at $370-million for a 3 500 t/d underground operation with total average yearly production of 12-million silver-equivalent ounces from the single Angela vein.

The project, which is located close to Hochschild's other operations in the south-west of Peru, is set to be the company's lowest-cost operation and would also require no additional central administration cost.

Further, exploration was also progressing at the property, which consists of 40 mining concessions with measured and indicated resources currently estimated at almost 90-million silver-equivalent ounces.

Hochschild said it strongly believes that the mineable resource base could be expanded significantly by upgrading the inferred mineral resources in the south-west and north-east extensions of the Angela vein into the reserve category through more definition drilling work.

In addition, the Inmaculada district hosts more than 25 km of gold-/silver-bearing quartz veins of the low-sulphidation type, which remain largely untested.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION