https://www.miningweekly.com

HIGH MARGIN GOLD

31st August 2018

By: Martin Creamer

Creamer Media Editor

     

Font size: - +

Pan African Resource’s Evander gold mine, in Mpumalanga, poured its first gold obtained through its newly commissioned Elikhulu tailings retreatment project on August 16. The R1.74-billion project uses a conventional carbon-in-leach circuit with a proprietary preoxidation process through which one-million tons of tailings is processed a month at an all-in sustaining cost of production of between $650/oz and $700/oz. The Elikhulu project is expected to produce about 55 000 oz/y of gold for 14 years and has created 400 permanent jobs.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION