https://www.miningweekly.com

Hastings adjusts Yangibana head grades

18th August 2021

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) - Rare earths developer Hastings Technology has reported a 26% upgrade to the life-of-mine (LoM) total rare earth oxide head grade at its Yangibana project, in the Gascoyne region, with the addition of an ore sorter to the process flowsheet.

The company told shareholders that based on the average content of alumina and silica for all Yangibana deposits, that 24% of the proposed crusher feed would be rejected by the ore sorters as waste at the expense of only 4% total rare earth oxide volumes across the LoM schedule.

“These results are enormously satisfying and exceed all our expectations; the introduction of ore sorting has removed waste or very low-grade material to deliver a significant overall improvement in the mine head grade that will be put through the more advanced stages of Yangibana’s process flow sheet,” said Hastings COO Andrew Reid.

“This, in turn, has the potential to reduce Yangibana’s processing operating costs and further enhance the value of the industry high levels of neodymium and praseodymium contained in our ore bodies.

“Importantly, the rejection of waste or very low-grade material at the front-end of the process has had almost no impact on Yangibana’s LoM, underpinning the potential win-win of adding the ore sorter to the overall process flow sheet.

“Hastings will now progress the detailed design for an ore sorting system that can process 100% of Yangibana’s LoM mine feed material.”

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION