Goro nickel mine faces increased regulation after tailings leak
Authorities in New Caledonia imposed additional regulations that could limit production in the future at the Goro nickel mine -- one of the world’s largest deposits -- after a recent waste-dam leak.
The company has dealt with the leak and significantly reduced water levels at the tailings dam, but additional measures are needed to prevent a repeat of the situation, according to a statement from the South Province, where the mine is located.
Local authorities issued a decree that imposes limits on production at the mine if the water levels in the waste dam exceed certain thresholds in the future, the province said, without providing further details.
The mine was forced to reduce output due to a “limited release of salt-laden liquid” after heavy rains in August, owner Prony Resources said in mid-November. The consortium, made up of employees, commodities trader Trafigura, Agio Global, and the New Caledonian government, acquired the mine last year from Brazilian miner Vale. Prony didn’t respond to requests for comment on the province’s latest statement or the current status of production at the mine.
Comments
The
functionality
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation