https://www.miningweekly.com

Goliath expands Golddigger claim

6th January 2021

By: Donna Slater

Features Deputy Editor and Chief Photographer

     

Font size: - +

TSX-listed precious metals explorer Goliath Resources reports extensive expansion of its claim holdings by 28%, based on significant results that cover additional key geologic terrane around the Surebet high-grade polymetallic gold/silver discovery on its 100%-controlled Golddigger property in the Golden Triangle of British Columbia.

The company has also adopted a shareholder rights plan, the purpose of which is to provide protection for the shareholders and board of directors with adequate time to consider and evaluate any unsolicited bid and to provide the board with adequate time to identify, develop and negotiate value-enhancing alternatives, if considered appropriate, to any such unsolicited bid.

The Golddigger property has been expanded by 28%, from 18 587 ha to 23 858.51 ha based on significant results that cover additional key geologic terrane around the Surebet zone.

Golddigger is located on tide water 30 km south east of the Stewart municipality in the Golden Triangle, and only 7 km west of the Dolly Varden mine access road, thereby providing for cost effective exploration.

Goliath CEO Roger Rosmus states that the Surebet discovery and results to date have “far exceeded” the company’s expectations and have “excellent potential” to rapidly evolve into a higher-grade gold/silver mineralised system in the Golden Triangle.

The newly discovered Surebet zone is located about 8 km south west of Fury Gold Mines’ Homestake Ridge property, a high-grade gold/silver resource estimate that contains 982 700 oz of gold at a grade of 4.99 g/t and 19.6-million ounces of silver at a grade of 97.7 g/t.

Multiple high-grade polymetallic gold/silver targets have been identified along 1 km of strike at surface and 500 m of vertical relief.

“The interest from majors and institutional investors alike is a strong testament of the mineralisation to date on the project in a low political risk and geopolitically stable jurisdiction of British Columbia, Canada,” he says.

In addition, Rosmus notes that Goliath looks forward to carrying out its fully funded 2021 inaugural drill programme.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION