https://www.miningweekly.com

Goldgroup Mining gets explosives permit for Mexican operation

27th February 2014

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – Mexico-focused gold producer Goldgroup Mining on Thursday said that it had received an explosives permit from the Secretary of National Defense, which was the final permit necessary for full-scale operations at the company's 100%-owned Cerro Prieto openpit, heap leach gold mine in Sonora state, Mexico.

The explosives permit would allow Goldgroup, which started pouring gold from the project last month, to order and use explosives for mining purposes under military supervision.

The environmental-impact statement and the authorisation of change of land use for the project were previously granted.

"In commencing trial mining over the last three months we were restricted to bulldozer ripping. With the granting of the explosives permit, Goldgroup can now ramp up to full-scale mining at our mine,” Goldgroup chairperson and CEO Keith Piggott said.

He added that the tertiary crusher had been commissioned, which, owing to the a finer crush size, was expected to reduce the leach time for precious metals. “We now expect gold production to increase to a steady state as the heap leach pad builds,” he said.

The company stressed that it was not basing its production decision on a preliminary economic assessment demonstrating the potential viability of mineral resources, nor a feasibility study of mineral reserves demonstrating economic and technical viability at Cerro Prieto, and as a result there was increased uncertainty and multiple technical and economic risks associated with this production decision.

The Cerro Prieto project encompasses mineral concessions totalling about 7 000 ha and contains about 17.5 km of strike length of the mineralised structure hosting the current resource.

The company acquired the Cerro Prieto project last year through a $18-million deal in which it bought TSX-V-listed Oroco Resource Corporation.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION