https://www.miningweekly.com

Golden Investments says Stanmore offer final

16th January 2019

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Suitor Golden Investments has told the shareholders of ASX-listed Stanmore Coal that it will not be increasing its offer price of 95c a share, and that it will not extend its offer date past January 22.

Stanmore in December urged shareholders to reject the offer, saying the price was “materially inadequate” and did not provide an appropriate control premium.

At the time, the coal miner told shareholders that independent expert BDO Corporate Finance had estimated the controlling interest value of Stanmore shares to be between A$1.48 and A$1.90 a share, and had concluded that the offer was neither fair, nor reasonable.

However, Golden Investment has appointed Grant Thornton as its own independent reviewer of the offer, and told Stanmore shareholders that it identified ‘material issues’ with the BDO assessment.

Grant Thornton had assessed Stanmore’s shares to be valued at between A$0.84 and A$1.10 a share.

Golden Investment further pointed out that no alternative offer had arisen since the initial offer was launched in November last year.

The suitor told Stanmore shareholders that its offer represented a certain full liquidity opportunity, with the offer also being declared unconditional.

Stanmore operates the Isaac Plains mine, in Queensland, which consists of the original Isaac Plains mine, the operational Isaac Plains East deposit, the Isaac Downs openpit operation and the Isaac Plains underground operation, which is currently being assessed in a bankable feasibility study.

The miner has projected an earnings before interest, taxes, depreciation and amortisation of between A$130-million and A$150-million for the 2019 financial year, up from the A$45.6-million reported in the 2018 financial year, with coal production expected to reach two-million tonnes over the same period.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION