Gold Mountain to begin construction of BC gold/silver project
British Columbia-based explorer and developer Gold Mountain is set to begin construction at its Elk Gold project, near Merritt, British Columbia, this month, following authorisation last week to put the gold and silver mine back into production.
The company has received a notice of departure (NoD), which allows it to begin construction and site preparation at Elk Gold under its existing M-199 mine permit.
CEO Kevin Smith said in a statement on Friday that feedback from institutions had been that Gold Mountain’s projected timelines for the past-producing Elk Gold – which it aims to develop into a million-ounce producer – might be difficult to achieve.
"Receiving this NoD allows us to take the critical steps of upgrading our existing water management system, installing a weigh scale, as well as leveraging a gravel borrow to start stripping waste from our initial pit and repurpose it into aggregate needed to resurface roads throughout the property. By getting into construction early, we will be ready to hit the ground running once our various mine permit amendments are approved,” he said.
With the snow on site nearly gone, Gold Mountain’s mine construction partner, Nhwelmen-Lake, had been notified to begin mobilising its equipment, in anticipation of developing the mine.
Gold Mountain was formed through the merger of Bayshore Minerals and Freeform Capital in December last year.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation