https://www.miningweekly.com

Garpenberg mine, Sweden

8th February 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name: Garpenberg mine.

Location: The mine is located in Hedemora municipality, Dalarna County, Sweden.

Controlling Company: Boliden Group.

Brief Description: Garpenberg is one of the world’s most modern mines. It is also Sweden’s oldest mining area still in operation. Garpenberg’s has an estimated 25-year mine life.

Brief History: Boliden has owned the Garpenberg mine since 1957. In 2011 the company decided to invest SKr3.9-billion to expand the operation to increase production to 25-million tonnes a year.

Products: The mine extracts zinc, lead, silver, copper and gold.

Geology/Mineralisation: The Bergslagen district deposits date back to the middle precambrian but may have been remobilised later. The polymetallic mineralisation is complex, with varying amounts and proportions of zinc, lead, copper and precious metals. The Garpenberg North orebody is regarded as a zinc deposit with silver and lead.

Reserves: Total proven reserves as at December 31, 2017, were estimated at 21.9-million tonnes grading 0.24 g/t gold, 109 g/t silver, 0.04%,  3.6% zinc and 1.4% lead. Total probable reserves were estimated at 55.8-million tonnes grading 0.34 g/t gold, 96 g/t silver, 0.05% copper 2.9% zinc and 1.4% lead.

Resources: Total measured resources as at December 31, 2017, were an estimated 5.7-million tonnes 0.29 g/t gold, 99 g/t silver, 0.06% copper, 3.7% zinc and 1.7% lead.

Mining Method: Underground, using sublevel stoping. Other mining methods include cut-and-fill mining, rill mining and residual mining of sill pillars

Major Infrastructure and Equipment: The mine includes rock and personnel shafts, ore and personnel hoists, a 68 m headframe, a ventilation facility, two crushing stations, an above-ground storage facility, a concentrator, a primary mill, flotation units, five pressure air filters and ore concentrate silos.

Prospects: None stated.

Contact Details:
Boliden Group
Tel +46 8 610 1523
Fax +46 70 291 5780
Email olof.grenmark@boliden.com
Website https://www.boliden.com

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION