https://www.miningweekly.com

France allows cyanide processing at gold mine in French Guiana

4th December 2019

By: Creamer Media Reporter

     

Font size: - +

The French government has authorised the startup of a cyanide processing plant at a gold mine west of Cayenne, the capital of French Guiana, a decision that TSX-listed Columbus Gold hailed as a “very positive” development.

“This development is a major step and a clear message that the French government is committed to developing the gold mining industry in French Guiana,” says Columbus Gold president and CEO Rock Lefrançois.

Construction of the cyanide processing plant at Dieu-Merci was approved by the state services in 2015 and operations were approved last month.

With all permits in place, commissioning will commence soon for a start of processing slated for early 2020. The plant will have a capacity of 300 t/d with extraction of 90% of the gold by cyanidation.

The decision is based on several recent independent French agency reports that have studied the risks and best practices of cyanide extraction technology for gold.

According to the French National Institute of Industrial Environment and Risk, the use of cyanide is appropriate for gold extraction in French Guiana.

The French Geological Survey also confirmed that there was no viable alternative to cyanide in gold mining, and that cyanide was used by more than 400 facilities worldwide, including in the most modern European mines.

The reports conclude that the main risks are related to the transport and storage of the product and that cyanide technology offers a maturity and a robustness superior to any other existing alternative. Cyanide technology is used at two major gold mines in neighbouring Suriname.

Columbus owns the Montagne d'Or project in a 44.99:55.01 joint venture with Nordgold. It is also advancing the Maripa gold exploration project, where past drilling had returned excellent near surface results, including 36 m of 4.3 g/t gold. 

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION