https://www.miningweekly.com

Foran assembles specialists for carbon-neutral copper mine study

31st March 2021

By: Creamer Media Reporter

     

Font size: - +

Exploration company Foran Mining has bolstered the design team for its ongoing definitive feasibility study at its McIlvenna Bay deposit in Saskatchewan, where it aims to build Canada’s first copper mine that is designed to be carbon neutral from day one.

The feasibility study team includes Stantec for mine design and engineering; Knight Piesold for the tailings storage facility design; Halyard for the process plant design; Micon International for the resource estimate; Base Metallurgical Laboratories for metallurgical testing; Canada North Environmental Services for environmental aspects and Synergy Enterprises for sustainability and carbon accounting.

"McIlvenna Bay will be a mine for the future, designed to be carbon neutral from day one of production. Importantly for our shareholders, our due diligence strongly suggests that we can generate superior returns using renewable energy and electric fleets, for example.

"With this in mind, the appointment of these world-class environmental and engineering specialists reflects our ambition to develop a technically and economically compelling solution to the environmental and social challenges which have been traditionally associated with the sector. We are therefore thrilled that professionals of this calibre have agreed to support us on this journey,” commented Foran executive chairperson Dan Myerson.

The responsible production of copper and zinc is critical as the world transitions to a low carbon future, as these metals are used in the production of renewable energy assets and electronic industries.

Foran filed a technical report for the prefeasibility study in April last year, which demonstrated positive economics for McIlvenna Bay at lower metal prices than currently forecasted and identified numerous development opportunities.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION