https://www.miningweekly.com

Exploration at Lulo adds two new high-priority kimberlites for bulk sampling

24th June 2022

By: Darren Parker

Creamer Media Contributing Editor Online

     

Font size: - +

The kimberlite exploration work programme at Lulo, in Angola, has been boosted by the addition of two new high-priority kimberlites for bulk sampling, says ASX-listed Lucapa Diamond Company.

Lucapa, which owns Lulo in a partnership with Angolan national mining company Endiama and private Angolan company Rosas & Petalas, said on Friday that the latest phase of discovery drilling had identified 24 new kimberlites, bringing the total number of kimberlites discovered at Lulo to 133.

Samples from eight of the 24 recently discovered kimberlites have already been sent to South Africa for indicator mineral picking, which will undergo mineral chemistry analysis in Canada.

Lucapa and partners noted that indicator minerals picked from two of the eight kimberlite samples – L056 and L403 – contained numerous high-interest deep purple garnets and chrome diopsides, which are often associated with diamondiferous kimberlites.

As a result, these have been added to the list of high-priority kimberlites for bulk sampling. The mineral chemistry results will determine if additional kimberlites are added to the priority bulk sampling list in the coming months.

New trucks have been mobilised to assist in the ramp up of kimberlite exploration activities.

Meanwhile, Lucapa said that the construction of the kimberlite bulk sampling plant (KBSP) at Lulo was advanced, notwithstanding logistics challenges. Commissioning of the plant is expected to take place in July.

“The construction and commissioning of the bulk sampling plant will enable us to process samples from these high priority kimberlites and bring us one step closer to finding the primary sources of the abundant large and high-value alluvial diamonds which we are recovering at Lulo,” Lucapa MD Stephen Wetherall said.

The KBSP has been positioned close to the majority of the key priority kimberlites to reduce sample turnaround time and costs. New trucks have also been mobilised to assist with the ramp up of kimberlite exploration activities.

“From the time that the plant is commissioned, we expect to be processing, on average, two bulk samples every six weeks,” Wetherall added.

Two of the five high-priority kimberlites already bulk sampled have been shown to be diamondiferous.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION