European Metals reports improved lithium recoveries from Czech project
JOHANNESBURG (miningweekly.com) – The economics of the Cinovec lithium/tin project are likely to be enhanced by the recent higher lithium recoveries that Australia- and UK-listed European Metals achieved during its ongoing metallurgical optimisation and ore variability testwork programme.
Lithium leach recoveries of 94% to 95% were achieved from laboratory roasting and water leaching tests, the company reported on Tuesday.
The tests confirmed that a modest increase in roasting temperature significantly increased lithium recovery and that the substitution of the more cost-effective reagent, limestone, instead of lime, did not reduce lithium recovery.
European Metals said that the use of limestone should result in significant cost savings in this part of the flowsheet.
"We continue to work on optimising all aspects of the Cinovec project and are pleased to be able to report significantly increased lithium recoveries from our roast/leach process, together with potentially lower operating costs in that section of the process,” said MD Keith Coughlan.
He added that the higher recoveries and lower costs would enhance the economics of the project, which according to the prefeasibility study of 2017 would be in the bottom half of the cost curve.
The study indicated a post tax net present value of $54-million and an internal rate of return of 21%. It confirmed the deposit will be amenable to bulk underground mining.
Comments
The
functionality
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation