https://www.miningweekly.com

Euro Manganese finds offtake partner in Verkor

12th January 2023

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX- and TSX-listed Euro Manganese has signed an offtake term sheet with electric vehicle battery manufacturer Verkor for the sale of high-purity manganese sulphate monohydrate (HPMSM) from its Chvaletice manganese project, in the Czech Republic.

Euro told shareholders on Thursday that the offtake tonnage would be equivalent to a percentage of annual HPMSM production on a take-or-pay basis, with first deliveries targeted for 2027 and spanning over an initial eight-year term, with the potential for renewal.

Pricing will be based on an index-adjusted western benchmark price, and will rise and fall proportionally with the movement of a published HPMSM index on a rolling three-month quotational period.

“This is a major milestone for Euro Manganese and for the European battery value chain. I am immensely proud of the team and their hard work in negotiating the first long-term offtake term sheet, with a pricing structure, from a Western supplier in the high-purity manganese market,” said Euro Manganese president and CEO Dr Matthew James.

“Verkor has undertaken due diligence on our completed feasibility study and has placed their confidence in us and in our product. We look forward to supplying to them as they advance on their goals of delivering batteries to their customers, including Renault Group. Together, we are aligned in our pursuit of helping to create a cleaner world by enabling the green energy transition.”

A 2022 feasibility study into the Chvaletice manganese project estimated that it would have an operating life of 25 years, producing 47 800 t/y of high purity electrolytic manganese metal, or 1.1-million tonnes over the life of the project.

Verkor recently inked a non-binding letter of intent with fellow ASX-listed Talga Group for the supply of graphite anode from its Vittangi project, in Spain.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION