https://www.miningweekly.com

Etango-8 PFS proves positive

2nd August 2021

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – A prefeasibility study (PFS) into the Etango-8 uranium project, in Namibia, has confirmed the technical and economic viability of an eight-million-tonne-a-year operation.

ASX-listed Bannerman Resources on Monday announced that the project would require a capital investment of $274-million to support production of 3.5-million pounds a year of uranium oxide (U3O8) over a mine life of 15 years.

The PFS estimated a life-of-mine production of some 52.9-million pounds U3O8, based on a maiden ore reserve of 117.6-million tonnes, at 232 parts per million, for 60.3-million pounds of U3O8.

The PFS estimated that the project would have a post-tax net present value of $222-million, a post-tax internal rate of return of 20.3% and a post-tax payback of 3.8 years, with cash flow forecast at $642-million.

The PFS is based on a contract mining operation, with mining costs estimated at $2.45/t of material mined, based on indicative quotes sourced from regional mining contractors. Total operating costs for the Etango-8 project have been estimated at $16.80/t of ore, or some $37.35/lb.

“I am extremely pleased with the outcomes of the Etango-8 PFS. The underlying robustness of this streamlined development approach to the world-class Etango resource has now been confirmed to a PFS level of accuracy,” said Bannerman CEO Brandon Munro.

“We now look forward to the completion of a definitive feasibility study for Etango-8 in the September 2022 quarter. This process will again benefit from the fact that Etango has already been the subject of a definitive level of feasibility study, at a larger scale, in recent years.”

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION