https://www.miningweekly.com

Equipment mobilisation for Bibemi project starts

16th October 2020

     

Font size: - +

West Africa-focused metals exploration company Oriole Resources last month announced that mineral drilling solutions provider Capital Limited had started mobilising equipment for a 3 000 m diamond drilling contract for the Bibemi exploration licence in Cameroon.

The press release notes that Oriole anticipates that mobilisation of equipment will take about six to eight weeks, which will enable Oriole to start its planned maiden drilling programme during the fourth quarter. Seventeen drill holes have already been identified and pegged within the high-grade Bakassi area for a planned programme of 1 940 m.

The programme will focus on testing the depth-extension of mineralisation identified to date and further targeting is planned at the northern end of Bakassi, which remains open along strike.


“We are very pleased that the mobilisation of the equipment for the drill programme at Bibemi – which was delayed [as a result of] the Covid-19 pandemic – has begun,” says Oriole Resources CEO Tim Livesay.

He states that the company is confident that Bibemi will continue to build on the good results it has already yielded from the rock chip sampling and trenching programmes, adding that “it will be great to get some vertical extension to the significant trends the team have already identified on surface”.

Moreover, the company will, upon completion of the drill programme, have satisfied the earn-in conditions to vest at 90% of the project.

Oriole noted that, under the terms of its option agreement with Bureau d’Etudes et d’Investigations Géologico-minières, Géotechniques et Géophysiques SARL, the company is earning up to a 90% interest in the Bibemi and Wapouzé projects in northern Cameroon, by spending $3.12-million over four years. The company is currently in Year 3 of that investment period.

“We look forward to sharing the results of our drill programme with our shareholders in due course.”

Edited by Nadine James
Features Deputy Editor

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION