Eastplats targets first revenue from tailings project in Q3
JOHANNESBURG (miningweekly.com) – Vancouver-based Eastern Platinum (Eastplats) reported on Wednesday that the construction of its Barplats subsidiary’s tailings facility at the Crocodile River mine, in South Africa’s North-West, was progressing well and that it expected to generate its first revenue from the operation in the third quarter.
“The retreatment project provides new possibilities and options for Eastplats,” said the company, which ceased production at the Crocodile River mine in 2013.
On March 1, Eastplats entered into a framework agreement with Union Goal Offshore Solutions relating to construction, mining and processing of the tailings resource. Union Goal has made an upfront payment of $3.6-million to Barplats Mines.
Eastplats reported that equipment had arrived on site and that it was targeting commissioning of the plant in the third quarter.
The company reported that its management’s focus would be on advancing the tailings facility construction and ensuring that the anticipated schedule was maintained.
The delivery of the updated platinum group metals feasibility study on the same tailings resource at the Crocodile River mine early in the second quarter of 2018 could also provide additional economic opportunities for Eastplats in the near term.
Further, the company awaits the results of the completion of the Mareesburg feasibility study, which should be available at the end of the second quarter of 2018.
“2017 was a strong year of development for Eastplats, culminating in the execution of the UG agreement and the initiation of construction on the retreatment project,” said Eastplats in its 2017 annual results announcement.
The dual-listed group narrowed its loss by 83% from $55-million in 2016 to a net loss of $9.2-million in 2017.
Meanwhile, Nigel Dentoom, with 45 years’ experience in mining and metals joined the board of Eastplats directors.
Comments
The
functionality
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation