Eagle Mountain to accelerate work at Oracle Ridge
PERTH (miningweekly.com) – ASX-listed Eagle Mountain Mining has received firm commitments for an A$11-million capital raise to accelerate work at the Oracle Ridge copper project, in Arizona.
Institutional and sophisticated investors would subscribe for more than 31.4-million shares in Eagle Mountain, priced at 35c each, with the placement to be settled in two tranches.
The first 25.7-million shares will be placed under the company’s existing capacity, and would raise an initial A$9-million, while the second tranche of 5.7-million shares, to be taken up by an entity associated with MD Charles Bass, would be subject to shareholder approval.
“We are delighted to welcome several new, prominent institutional and sophisticated investors to the Eagle Mountain share register, and would like to thank existing shareholders for their continued support in the placement,” said CEO Tim Mason.
“The placement was very well received with strong demand exceeding the funds ultimately being sought by the company by several times, despite being at no discount to the last traded price. This is a testament to the quality of the Oracle Ridge project and the potential for near-mine areas to host further mineralisation.”
Funds raised will be used to continue diamond drilling at Oracle Ridge, and to transition the company towards feasibility studies.
Comments
The
functionality
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation