https://www.miningweekly.com

DRDGold’s output rises 45% q/q

27th October 2020

By: Tasneem Bulbulia

Senior Contributing Editor Online

     

Font size: - +

Dual-listed DRDGold reported a 45% quarter-on-quarter increase in gold production to 48 676 oz (1 514 kg) for the quarter ended September 30, owing primarily to a 27% increase in tonnage throughput to 7.26-million tonnes and a 15% increase in yield to 0.209 g/t.

Gold sold increased by 60% to 48 934 oz (1 522 kg).

As a result, cash operating costs per kilogram of gold sold decreased by 10% to R489 750/kg. Cash operating costs per ton of material processed increased by 2% to R104/t.

In dollar terms, cash operating costs decreased by 4% quarter-on-quarter to $901/oz, while cash operating cost per ton of material processed was unchanged at $6/t.

All-in sustaining costs (AISC) per kilogram and all-in costs (AIC) per kilogram increased by 2% and 3%, respectively, to R588 239/kg and R613 206/kg, mainly as a result of a 13% quarter-on-quarter increase in sustaining capital expenditure to R95.1-million.

In dollar terms, AISC was 8% higher quarter-on-quarter, at $1 083/oz, while AIC was up 9% quarter-on-quarter, at $1 129/oz.

Adjusted earnings before interest, taxes, depreciation and amortisation increased by 110% to R770.4-million, owing primarily to the increase in gold sold and a 6% increase in the average rand gold price received.

Cash and cash equivalents increased by R300.1-million to R2.02-billion after paying the final dividend for the year ended June 30 of R299.1-million.

The cash generated during the current quarter will be applied towards the company’s extended capital expenditure (capex) programme for the year ended June 30, 2021.

The company said that, despite the capex planned for the year, management positions it favourably to consider declaring an interim dividend in February 2021, in the absence of unforeseen circumstances.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION