BFS affirms 'compelling' opportunity at Crown Mountain
PERTH (miningweekly.com) – A bankable feasibility study (BFS) into the Crown Mountain coking coal project, in British Columbia, has found that the project could produce an average of 1.7-million tonnes a year of saleable coal and 57.5-million tonnes a year run-of-mine coal over a mine life of 15 years.
ASX-listed Jameson Resources this week noted that the project would require a capital investment of some $309-million, with cash costs estimated at $93.17/t, while the study estimated a post-tax net present value of $217-million and an internal rate of return of 27.2%.
The BFS estimated that the project would deliver post-tax net cashflows of $652-million.
Jameson told shareholders that the BFS reaffirmed that Crown Mountain represented a "compelling" high-quality coking coal opportunity for development within a" competitive" operating and capital cost structure, with access to existing common-user rail and port infrastructure.
The company said that the BFS has identified areas of potential optimisation, which would now be assessed in order to improve the overall execution and economics of the Crown Mountain project.
These optimisation activities would increase the coal handling and preparation plant (CHPP) hours, improving the yield through the production of higher ash product, reducing the capital cost of the CHPP by assessing either lower-cost Chinese steel sourcing for the current design or a modular pre-assembled plant design, as well as investigating contract mining or leasing of mobile equipment and workshops to reduce the up-front capital cost.
There was also the possibility to increase the existing inferred resource, with additional exploration in the Southern extension, the Australian company said.
Comments
The
functionality
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation