The Gauteng High Court has set aside the National Energy Regulator of South Africa’s (Nersa’s) most recent evaluation of Eskom’s regulatory asset base (RAB), a decision that has potential significant implications for a pending tariff determination.

The State-owned utility took the regulator’s RAB decision on legal review after Nersa more than halved Eskom’s RAB to R551-billion relative to the R1.25-trillion outlined in its revenue application for the 2022/23 financial year.

The cut in the RAB contributed to the Energy Regulator’s decision to approve a 9.61% hike for 2022/23, which was less than half the 20.5% hike for which Eskom had applied.

While the order will have no retrospective effect, the court has instructed Nersa to re-determine Eskom’s RAB for subsequent years, with implications for the tariffs to be applied in 2023/24 and 2024/25.

That tariff decision, which is currently under adjudication by Nersa following recent public hearings, was initially expected by November 7, but the regulator has until December 24 to make a determination in line with a timeline stipulated in a separate court order.

Eskom has applied for a 32% hike from April 1; an increase that includes 10.67% to “correct” the depreciation figure that was affected by the cut of the RAB, as well as a further 2.85% to “correct” the return on assets amount.

The actual outcome will depend on what Nersa determines the RAB to be, however.

The High Court order also outlines the specific steps that the regulator needs to take to re-determine the 2022/23 RAB, including that:

  • only commissioned assets be included in the replacement cost determination and that assets under construction be valued at book value, excluding capitalised interest during construction until they can be transferred to the commission-asset category;
  • the regulator reverses a flue gas desulphurisation adjustment incorrectly made in its earlier decision;
  • the accumulated depreciation adjustment be made to reflect the correct remaining useful lives of the power stations to ensure that they do not have negative RAB values;
  • the correct remaining useful life of each power station is used when the roll-forward depreciation is calculated;
  • Nersa comply with the multiyear price determination methodology with regards to energy availability factor adjustments for Eskom generators;
  • the completed generation, transmission and distribution asset value not included in the RAB of 2022/23 be included; and
  • the book value, excluding capitalised interest during construction, of all assets under construction be used in the RAB determination.

Once the RAB value is determined, the completed assets will need to be depreciated.

In the disputed RAB of 2022/23, depreciation of R42-billion was approved against Eskom’s request for more than R60-billion.

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION