Costs at American Lithium's Peru project up to $700m, CEO says
Costs of the first phase of construction at American Lithium's Falchani lithium mine in Peru likely have risen some 20% from an original estimate to $700-million, the CEO of the firm said in an interview.
"If you think about the post-Covid world and inflationary pressures, that bill (of $580-million) is probably more like $700-million today," CEO Simon Clarke said.
Peru, the world's second-largest copper producer, is vying for a piece of the pie in the booming lithium market.
Nearby Chile, Argentina and Bolivia form a so-called "lithium triangle," with massive deposits, but the Canadian-owned Falchani project is currently the only one under way in Peru, where deposits are estimated to be much smaller.
The Peruvian government has made it clear "they want to attract other investment to drive the mining sector forward," Clarke said, mentioning drill permit approvals coming in since a government shake-up last year.
If all goes according to plan, construction could begin at Falchani by late 2024 or late 2025, Clarke said, to begin production in late 2026 or early 2027.
Before that, an environmental impact assessment, which could take another three to six months, and an updated economic assessment need to wrap up.
A new economic assessment will also be carried out to include byproducts potassium, cesium and rubidium, which were not analyzed in the original study, Clarke said.
Clarke said the firm was in talks for investment in the project, adding that it was doing drilling tests in a new area near Falchani after receiving approvals last month.
"We're certainly very excited by what we saw on the surface," Clarke said. "We should start to get results from that over the next couple of months."
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation