Commissioning starts at Plomosas
PERTH (miningweekly.com) – Commissioning activities have started at the Plomosas processing plant, in Mexico.
ASX-listed Consolidated Zinc on Wednesday reported that the mill and wet end of the plant would be commissioned from March 13, adding that a short commissioning period was expected.
“We are very pleased with the progress made to date commissioning the Plomosas plant. Our modelling indicates a bright future for Consolidated Zinc at Plomosas and the increased cashflow from running the Plomosas and Aldama plants during the second quarter of 2021 should allow Consolidated Zinc to accelerate the expansion of the Plomosas plant to 200 t/d during 2021,” said Consolidated Zinc MD Brad Marwood.
The company started zinc production at Plomosas in September 2018 and achieved commercial production in December 2018.
The miner is now ramping production through the third party-owned Aldama concentrator and has an offtake agreement to sell all zinc concentrate produced to the Met-Mex Smelter located in Torreon, Mexico, a part of the Penoles Group.
Consolidated Zinc previously said that the Plomosas plant refurbishment would cost some $1.35-million, and would allow for the expansion of the plant from 3 000 t/m to 6 000 t/m.
“The size of the operations in production matters, as does direct control of the process, and the steps taken in the last few months strengthen our business model,” said Marwood on Wednesday.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation