https://www.miningweekly.com

CHROME CONTENDER:

2nd March 2018

By: Martin Creamer

Creamer Media Editor

     

Font size: - +

Johannesburg-listed platinum explorer and chrome-ore miner Bauba last week officially embarked on the underground development phase of its Moeijelijk chrome mine, in Limpopo. Bauba CEO Nick van der Hoven told Mining Weekly that he expected the mine to be close to full production by December, extracting at a rate of roughly 30 000 t of chrome ore a month. The mine design is 100% conventional, which has resulted in lower capital expenditure requirements. It is set to create about 400 direct and indirect jobs by year-end, with saleable chrome-ore production already under way.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION