https://www.miningweekly.com

China Moly to spend $2.5bn to double copper, cobalt output at Congo mine

6th August 2021

By: Reuters

  

Font size: - +

China Molybdenum Co said on Friday it would spend $2.51-billion to roughly double production of copper and cobalt at its giant Tenke Fungurume mine in the Democratic Republic of Congo.

The bumper investment comes as prices for both metals have jumped in 2021 amid a demand rebound from the Covid-19 pandemic.

Copper is up 23% year to date on the London Metal Exchange after hitting a record high of almost $10 750 a tonne in May, while cobalt is up 64% at about $52 000 a tonne.

China Moly said in a filing to the Shanghai Stock Exchange that the $2.5-billion investment - which will go toward building three ore production lines - would boost average annual copper output at the mine by 200,000 tonnes and increase cobalt output by 17 000 tonnes.

"The project is expected to be completed and put into production in 2023," it said, adding the end-products would be copper cathodes and cobalt hydroxide.

China Moly has an 80% stake in Tenke Fungurume, one of the world's largest copper-cobalt deposits. The mine produced around 182 600 tonnes of copper and 15 400 tonnes of cobalt in 2020. Output is forecast to be higher this year.

The company said it would finance the $2.5-billion investment with its own funds and through bank loans.

Edited by Reuters

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION