https://www.miningweekly.com

ChemX to build HPA plant

18th August 2022

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed ChemX Materials on Thursday announced plans to build a A$2.9-million high purity alumina (HPA) pilot plant in Western Australia, after a prefeasibility study (PFS) confirmed the viability of the company’s proprietary HiPurA technology.

The PFS was based on a  50 t/y pilot plant, and using data obtained from the ChemX’s successful HPA micro-plant commissioning phase and subsequent operation, the PFS incorporated several work streams and equipment modifications which have led to the design of an appropriately sized pilot plant.

The aims of the HiPurA HPA pilot plant are to optimise operating conditions to reduce the scale-up risks associated with a commercial plant, produce the larger quantities of HPA needed for the final stages of qualification, and continue with development of additional materials that the HiPurA technology could produce.

“The PFS has verified the HiPurA technology and our approach, with validation of flow sheet design and no fatal flaws identified. The lessons learnt, and those that will be learned, from continued operation of the micro-plant will significantly reduce the scale-up risks of developing the pilot and commercial plants,” said CEO Peter Lee.

MD David Leavy added that the company had secured a suitable industrial premises, that would accommodate both micro and pilot plants, from September 2022.

“We look forward to moving into our new facility, and the construction and operation of the HiPurA HPA pilot plant in Perth, Western Australia. ChemX is committed to the continued development and optimisation of the HiPurA technology, as well as the production of HPA to allow for customer testing and qualification.”

 

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION