https://www.miningweekly.com

Canyon signs strategic partnership deal for Cameroon project

26th August 2021

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed Canyon Resources has inked a strategic partnership agreement and memorandum of understanding (MoU) with the mining engineering division of global mining giant Metallurgical Corporation of China (MCC) for the development of the Minim Martap bauxite project, in Cameroon.

MCC, through Zhongye Changtian International Engineering Corporation of MCC (MCC-CIE), would offer necessary assistance to Canyon in facilitating the off-taking and financing for the project in China. MCC will also provide all necessary support to assist Canyon in technical, business off-taking and financial related issues.

“Canyon has worked with MCC-CIE since late 2020 on the bankable feasibility study (BFS) for the Minim Martap project and the signing of this Strategic Partnership and MoU is a very positive next step,” Canyon MD Phillip Gallagher said.

“Executing the MoU with MCC-CIE is a testament to the sound relationship Canyon and MCC-CIE have established in a relatively short space of time, and MCC-CIE will introduce real options for project financing and offtake. It is a great benefit to Canyon to have a strategic partner with extensive experience in building and operating mining projects in Africa.

“MCC-CIE is part of the MCC and Minmetals group of companies that own and operate mines across various commodities, alumina refineries and aluminium smelters. They know the Minim Martap project very well due to their ongoing involvement with the BFS. It is exciting to have a technical and financial partner of the scale and calibre of MCC-CIE offering to substantially increase its involvement in the project, thereby confirming MCC-CIE’s endorsement of the Minim Martap project and Cameroon as a whole.”

A 2020 prefeasibility study into the project estimated that it would cost some $120-million to develop.

The study reviewed the technical and commercial solutions for Stage 1 of a two-stage development plan, which consists of a mining and direct shipping ore export operation averaging some 5-million tonnes a year exporting through the existing Douala port.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION