https://www.miningweekly.com

Cameco places UF6 plant in safe shutdown mode

8th April 2020

By: Creamer Media Reporter

     

Font size: - +

Uranium fuel supplier Cameco will place its UF6 plant at the Port Hope conversion facility, in Ontario, in a temporary safe shutdown state for four weeks, as it faces difficulty in maintaining an adequate workforce as a result of screening protocols and other measures put in place to combat the Covid-19 health crisis.

“While our fuel services facilities have been able to operate safely, it has become increasingly challenging to maintain a sufficient roster of qualified operators for the UF6 plant,” Cameco president and CEO Tim Gitzel said on Tuesday.

“The UF6 plant is designed for continuous operation, and we need to prevent unplanned interruptions arising from personnel shortages.”

Work to place the plant in safe shutdown mode would occur over the coming days. The company said, where possible, it would bring forward maintenance work scheduled for the summer.

Since the majority of the UO3 produced at the Blind River refinery is used to produce UF6 at the conversion facility, the refinery’s production would also be temporarily suspended and, where possible, summer maintenance work brought forward.

The refinery would operate for about a week to produce sufficient UO3 for ongoing UO2 production at the conversion facility. Then, the refinery would be placed in a care and maintenance for about four weeks.

The refinery would remain open to receive uranium concentrate deliveries.

The conversion facility would continue to operate with its reduced workforce, currently reduced by about 65 employees, and the refinery would experience a reduction of about 60 employees.

UO2 production at the conversion facility, as well as fuel pellet and fuel bundle production at Cameco Fuel Manufacturing (CFM) would continue. The UO2 and CFM facilities are important links in the supply chain for Canada’s nuclear energy sector, and these plants were designed and operated to shut down and start up every week. Although they may experience workforce fluctuations as a result of the ongoing circumstances, they were better able to adapt quickly to changes in staffing levels and more frequent starts and stops in production if required.

“Cameco will continue to work with all of our customers to help meet their delivery needs and enable them to continue to provide the safe, clean, reliable nuclear power their governments and communities rely on to run hospitals, care homes, grocery stores and essential services during this time of extraordinary uncertainty,” Gitzel said.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION