https://www.miningweekly.com

Bushveld nudges vanadium output expectations higher

26th January 2022

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

Aim-listed Bushveld Minerals reached the upper end of its guidance for the year ended December 31, with production of 3 592 t of vanadium.

This was in line with guidance of between 3 400 t and 3 600 t, but below the 3 631 t produced in 2020.

Group sales were lower year-on-year at 3 314 t, owing to challenges in international logistics channels arising from Covid-19, and the civil unrest and resultant delays that ensued at local ports in July and August of last year.

With the company’s two operations – Vametco and Vanchem – performing well in the year under review, Bushveld has increased its production guidance for this year to between 4 200 t and 4 400 t, with volumes weighted towards the second half of the year, as Kiln 3 at Vanchem will soon be commissioned and ramped up.

Vametco’s production guidance is set at between 2 450 t and 2 550 t, while Vanchem is expected to produce between 1 750 t and 1 850 t of vanadium.

Bushveld envisions spending less capital expenditure this year, at $17-million, compared with the $29-million spent in 2021.

The company has cash and cash equivalents on hand of about $15-million.

CEO Fortune Mojapelo says demand for vanadium in the US, Europe and the rest of the world remains buoyant, while ferrovanadium prices have strengthened and currently trade at an average of about $35/kg across markets.

Bushveld continues to review prefeasibility and feasibility studies conducted at both operations during last year, including testing the economics of various growth options going forward.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION