https://www.miningweekly.com

Brazil's Bahia Mineracao starts production at iron-ore mine

3rd February 2021

By: Reuters

  

Font size: - +

RIO DE JANEIRO - Brazilian miner Bahia Mineracao, a subsidiary of Kazakhstan's Eurasian Resources Group, started production at a mine in northeastern Brazil with expected 2021 output of one-million tonnes of iron-ore, its chief executive said on Tuesday.

Bahia Mineracao plans to double output at the Pedra de Ferro mine in Bahia state to two-million tonnes of iron-ore by next year, CEO Eduardo Ledsham said in an interview.

The mine shipped its first cargo of ore in January, with first-quarter sales only to the domestic market, Ledsham said. Foreign shipments are expected to begin in April, he said.

The company plans to invest four-billion reais ($746.41-million) to ramp up annual production capacity to 18-million tonnes within five years, he said.

"I see that we're headed into a new cycle of high iron-ore," Ledsham said of demand for the metal, mainly from China.

As part of that planned capacity expansion, the company will rely on the first segment of the East-West Integration Railway (Fiol), which has yet to enter operation. On April 8 the government plans to auction off a 35-year concession to operate the railway which connects to the coast.

Ledsham said Bahia Mineracao plans to participate in the auction in a partnership with other investors, but declined to elaborate.

Fiol will connect to a port in the coastal city of Ilheus that is being constructed and will be jointly operated by Bahia Mineracao and the Bahia state government.

The initial iron ore shipments are being sent by road freight.

The Pedra de Ferro mine has reserves of 550-million tons of ore, about one-third of which is hematite that contains roughly 65% iron content.

Edited by Reuters

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION