https://www.miningweekly.com

Brazil vanadium mine delivers record production

15th October 2019

By: Creamer Media Reporter

     

Font size: - +

The Maracás Menchen mine in Bahia state, Brazil, has delivered a new quarterly production record of 2 952 t of vanadium pentoxide (V205), reflecting the impact of an expansion project that is now in its final stages of commissioning.  

The third-quarter production is a 17% increase over that of the second quarter and a 15% increase over the third quarter of last year, reported TSX-listed Large Resources on Tuesday.

The expansion project is in the final stages of commissioning following the startup of the new ball mill in September and Largo said that it should reach its nameplate capacity of 1 000 t of V2O5 in October.

Total year-to-date V2O5 production is 7 566 t and the company maintained its overall 2019 production guidance range of 10 000 t to 11 000 t for the year.

Largo has lowered its average cash operating guidance for the year from the range of $3.45/lb to $3.65/lb, to between $3.30/lb and $3/40/lb.

“Following two consecutive quarters of reported cash operating costs, excluding royalties, below our previously stated annual average cash cost guidance, management is very confident that its newly updated cash cost guidance for the year will be achieved in 2019,” commented president and CEO Paulo Misk.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION