https://www.miningweekly.com

Boss raises A$15m for Honeymoon work

1st October 2020

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Uranium developer Boss Resources will raise A$15-million in a share placement to fund ongoing technical process optimisation studies and exploration at the Honeymoon project, in South Australia.

The single tranche share placement will consist of some 225-million shares, priced at 6.7c a share, with Boss having received firm commitments from institutional and sophisticated investors.

The placement price represents a 6.9% discount to Boss’ last closing price on September 28, and a 9.9% discount to its five-day volume weighted average share price.

The shares will be placed under Boss’ existing placement capacity, and will not require shareholder approval.

“We are pleased with the strong support received from Australian and global institutions including a broad range of existing and new investors. Proceeds from the placement secure the company’s first mover advantage as we progress our enhanced feasibility study and continue towards a Honeymoon restart decision,” said Boss MD and CEO Duncan Craib.

Boss in September engaged GR Engineering to evaluate the replacement of existing solvent extraction columns on the Honeymoon site, and initial results have indicated the potential for this to substantially increase the production profile and reduce operating costs.

These findings will be incorporated into the enhanced feasibility study, scheduled for delivery in the first half of 2021.

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION