https://www.miningweekly.com

BHP moves ahead with Trion work

9th March 2020

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Diversified major BHP has confirmed the contractors appointed for the pre-front-end engineering design, or FEED, design competition for the Trion floating production unit.

The miner has confirmed that SBM Offshore USA, Technip USA, Genesis North America and McDermott have been selected to deliver an early engineering study for a semisubmersible floating production unit (FPU) for the Trion field in the deep-water Gulf of Mexico.

The design contracts have been awarded following a competitive tender process, and the work is anticipated to be completed within six months. 

BHP president operations petroleum, Geraldine Slattery, said on Monday that this was another step forward for the Trion project, which allowed for early engagement with the chosen contractors to optimise the design together with the contracting and execution strategy options for the FPU delivery. 

“We look forward to working with the selected contractors through this study phase.”

BHP holds a 60% interest in Trion, while Mexico’s PEMEX holds a 40% interest.

BHP in 2016 won the right to acquire a 60% participating interest in the oil field, which is expected to host a gross recoverable resource of 485-million barrels of oil equivalent. BHP’s bid for Trion included an up-front cash payment of $62.4-million and a minimum $320-million work programme commitment.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION