https://www.miningweekly.com

Reform to LME nickel contract ‘long overdue’ – BHP

10th March 2023

By: Bloomberg

  

Font size: - +

BHP Group, the world’s largest listed miner, said that the London Metal Exchange’s nickel contract does not represent the physical market and reform is “long overdue”.

Sliding volumes since a nickel trading fiasco last year, when the LME suspended the market for more than a week, have reinforced the problem on the world’s largest and oldest metals forum.

A doubling of LME nickel prices to record highs above $100 000/t on March 8 last year was triggered by the cutting of large short positions, or bets on lower prices, which led the exchange to cancel all trades for the metal that day.

“Reform of the LME’s metal delivery rules is long overdue. The LME short squeeze episode highlighted vulnerabilities that had been building for years,” Huw McKay, VP of market analysis and economics at BHP Group, said in the company’s latest economic and commodity outlook issued in Australia.

An LME spokesperson said in an email that the exchange “recognises the ongoing structural shift” in the nickel market.

“We are committed to working with the industry to ensure that the LME’s offering meets the industry's evolving pricing and risk management needs . . . we continue to explore ways in which we might enhance the contract specifications,” the spokesperson said in an email.

A major component of stainless steel, nickel is now also a key material for the electric vehicle industry, where it is used in the cathode component of batteries.

Edited by Bloomberg

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION