https://www.miningweekly.com

Azumah reports maiden underground resoure at Bepkong

2nd July 2019

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Gold explorer Azumah Resources has reported a maiden underground resource of 279 700 oz for the Bepkong deposit at its Wa gold project, in Ghana.

The resource estimate includes a measured and indicated resource of 167 500 oz, at 4.05 g/t.

Azumah on Tuesday said the definition of a maiden underground resource at Bepkong had more than doubled the total Bepkong mineral resource estimate to 517 000 oz, and lifted the grade by 59% to 2.38 g/t gold.

The total mineral resource estimate for the greater Wa project has also increased by 11%, to 2.77-million ounces, of which 65% has been classified as measured and indicated.

“Confirmation of a high-grade underground mineral resource at our Bepkong deposit of 279 700 oz, grading 3.59 g/t gold, provides a tremendous boost to Azuma’s fast evolving Wa gold project,” said Azumah MD Stephen Stone, noting that none of the underground mineral resource had been incorporated into the current one-million-ounce reserve, or into the feasibility study for the Wa project, which would be completed by year-end.

“A scoping study evaluating underground mining at Bepkong will be reported later in July and our expectations are that this could have a materially positive impact on what is an already financially robust project.

“With the prevailing gold price well above the $1 300/oz used in determining the ore reserve, the case for development becomes even more compelling and, looking to the longer term, we still have many additional shallow and deeper targets to evaluate within our regional-scale 2 400 km2 of prospective tenure.”

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION