https://www.miningweekly.com

Atalaya sets copper guidance for 2020

7th April 2020

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

A lower average copper price realised for the year ended December 31, 2019, resulted in TSX- and Aim-listed Atalaya Mining generating lower aftertax profit of €31-million, compared with €34-million in the year ended December 31, 2018.

The average copper price realised in the year under review was $2.73/lb, compared with an average realised price of $2.95/lb in the prior year.

However, the company reported higher production at 44 950 t of copper in the year under review, compared with copper production of 41 114 t in the prior year. This reflects the positive impact of the company’s expansion project at Proyecto Riotinto, in Spain, which was commissioned at the end of the year.

The plant at Proyecto Riotinto can now process 15-million tonnes of copper a year.

Atalaya set its production guidance for 2020 at between 55 000 t and 58 000 t of copper. The company will provide an update should it occur that the company cannot achieve this guidance as a result of Covid-19 impacts.

Operations at Proyecto Riotinto were temporarily halted as a result of a royal decree ordering mines to only conduct essential activities, however, the project has since been authorised to operate.

To mitigate the potential operational and financial impact of Covid-19, the company has increased its cash balance from €8-million at year-end, to €41-million currently, by drawing down on existing credit facilities.

Meanwhile, the miner is also continuing with exploration and infill drilling at the Atalaya and Cerro Colorado pits, with 7 238 m and 4 959 m drilled at the pits last year, respectively. The company spent €3.6-million on exploration in 2019, compared with €1-million spent on exploration in 2018.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION