Argonaut cleared to start work on C$480m Ontario gold project
Toronto-listed Argonaut Gold has been cleared to start site preparation for the construction of its C$480-million Magino gold mine.
The Toronto-listed company announced on Thursday that the province of Ontario had filed the closure plan for Magino, which would produce about 150 000 oz/y in the first five years of its 17-year mine life.
"The filing of the closure plan is a significant milestone and allows us to begin site preparation activities for construction of the Magino mine and processing facility,” said president and CEO Pete Dougherty in a statement.
Argonaut envisions a two-year construction period with first gold production at Magino during the first half of 2023.
The Magino project initial capital estimate of between C$480-million and C$510-million, of which approximately 40% is covered by a fixed-bid contract with Ausenco Engineering Canada, is considered fully financed through Argonaut's current cash balance and anticipated cash flow from operations assuming a gold price environment at or above $1 600/oz.
“Magino is truly a valuable and strategic asset given existing infrastructure, the already-known mineral endowment of the orebody and the existing exploration potential, its location within the mining-friendly jurisdiction of Ontario, Canada and its proximity to other strong cash flowing operations such as the Island Gold mine,” said Dougherty.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation